Jeremy J. Kox Landscape Architecture, 
	LLC Schedule / Time Guidelines
        Projects vary dramatically in size, scope 
        and complexity. Even so, all of our project timetables are tailored to 
        meet your needs (you may have specific target dates for completion).   
        We are flexible in the design process to meet those needs.  Our 
        design schedule is arranged around your work, vacation and travel 
        schedule.  
        Standard Project Timetable
        
          
            
              | 
               Design Phase 
				 | 
              
               Time Frame 
				 | 
             
            
              | 
			  Design Programming, Inventory, and Analysis | 
              
			    1 week | 
             
            
              | 
			  Civil Survey (if necessary) | 
              
			   2 weeks  | 
             
            
              | 
			  Concept Design | 
              
			    1 week | 
             
            
              | 
			   Design Development, Bid 
			  Documentation 
				 | 
              
			    2-5 weeks 
				 | 
             
            
              | 
			  Total Projected Design Timeframe | 
              
			   4-9 weeks | 
             
            
              | 
				 | 
              
				 | 
             
            
              | 
			  Project Installation | 
              
			  Time Frame | 
             
            
              | 
			   Contract Letting 
				 | 
              
			    2 weeks 
				 | 
             
            
              | 
			  Contractor Selection, Bid Award, and Contracting | 
              
			    1 week | 
             
            
              | 
			   Scheduling, Permitting, Project Backlog | 
              
			    Variable (1-8 weeks) | 
             
            
              | 
			   Construction 
              (scope/complexity dependent) 
				 | 
              
			    Variable (1-12 
              Weeks) 
				 | 
             
            
              | 
			  Total Projected Installation Design Timeframe | 
              
			   5-24 weeks  | 
             
            
              | 
			    | 
              
			    | 
             
            
              | 
			   Turn-Key Projection (Overall 
              Project) 
				 | 
              
			    9-33 
			  weeks 
				 | 
             
           
         
	The most unpredictable part of the timetable is the contractor's 
        availability to start work. There is often a waiting period of two to 
        eight weeks in which the contractor finishes other work they have 
        previously committed to. While overall project timetables vary 
        considerably from our first meeting until completion of construction, 
        they usually take a minimum of three months. 
        Early spring and late autumn projects may take longer to accomplish, due 
        to inclement weather, but an advantage is that the contractor-waiting 
        period is often shorter.  Late season starts may require project 
		suspension if weather becomes too severe and/or interfers with 
		acceptable construction methods or risks new vegetation health.  
  
	
  
  
 
  |